Progress by zone

Zone Collection complete To do Scale present Files transferred and renamed White balance
(side A of the chart)
TIFs generated Targets detected /
Scale(s) defined
Camera calibration z18v2 /
capture distance
Alignment
(workflow 1)
Optimization
(workflow 2)
Cloud
cleanup
1
2 ✓ -The whole floor area between the piers is missing: check whether
it can be scanned
this part of the zone is loose silt, too hard to scan.
✓ ✓
3 - redo the arches with the west face ✓ ✓
4 - redo the north face of the pier between -36’ (-11m) and -40’ (-12.2m),
and between the west wall and the 2nd groove;
- scan the underside of the arches, as much as possible
✓ ✓ ✓ ✓ ✓
5 ✓ ✓ ✓ ✓ ✓
6
7
8
9
10 ✓ ✓ ✓ ✓ ✓ ✓
11 ✓ ✓ ✓ ✓ ✓
12 ✓
13
14
15
16 ✓ -scale
- segments toward zones 6 and 16
✓ ✓ ✓ ✓ ✓
17
18 - west wall
- structures to the west
- north tie-in
✓ ✓ ✓ ✓ ✓
19
20